Capella solar power plant (El Salvador)
Construction of a ground-mounted power plant with a capacity of 140MWac/140MWdc.
The plant has been feeding into the grid since 20 December 2019, and at full capacity since 25 January 2020.
This single-axis tracker (ATI) project consists of 412,548 340Wp modules supplied by Jinko, as well as 23 SMA MV converter stations with 2 SC2500 inverters each.
Technical data:
- Total power: 140,000,000Wp ;
- Photovoltaic modules: 412,548 Jinko 340Wp modules;
- Installation system: ATI single-axis tracker;
- Inverters: 23 SMA MV converter stations containing 2 inverters each SC2500.